Plowing
When 2-3 inches of snow has accumulated, crews begin to work on roads and sidewalks along main routes; when snow levels reach 3-4 inches, plows will visit secondary/local roads and sidewalks. Staff watch temperature and snowfall amounts closely. Plows may be diverted from one area to another during weather events. This helps maintain routes with high traffic, safely and more efficiently.
Main roads aim to be plowed within 6-12 hours after snowfall has ended, and all other roads within 12-16 hours after snowfall has ended. We aim to have all sidewalks clear within 48 hours. The length of time it will take to plow roads, depends on:
- Time of day storm starts
- Time of day storm ends
- How long storm lasts
- Wind conditions
- Temperatures
- Traffic and obstacles (i.e. parked cars)
Plowing vehicles
The Town has:
- Ten plow/sander trucks
- Graders
- Loaders
- Three sidewalk plows
Each of these vehicles have an assigned route.