A capital project refers to the reconstruction of an asset, including:
- Road reconstruction (road base, road surface, curb and gutters, storm sewers, catch basins)
- Bridge rehabilitation and reconstruction
- Sidewalks/streetlights/major culvert replacements
Reconstruction of a capital asset resets its lifecycle and its lifecycle can determine future financial planning. These projects are pre-approved through the budget process or are required due to an emergency situation.
2026
Town of Huntsville Capital Projects
| Location | Type of Capital | Projected Timeline |
|
Otter Lake Road (West Browns Road to end)
|
Base Stabilization & Double Surface Treatment
|
June 22 to September 4 |
| Clearwater Lake Road (Estonian Camp Road to end) | Base Stabilization & Double Surface Treatment | June 22 to September 4 |
| Rockhaven Road (Hwy 11 to end) | Base Stabilization & Double Surface Treatment | June 22 to September 4 |
| Old Muskoka Road (Hwy 141 to Stephenson Road 2W) | Slurry Seal | August 2026 |
| South Waseosa Lake Road (Ravenscliffe Road to end) | Slurry Seal | August 2026 |
| Grandview Reconstruction | Full Reconstruction | Late June to Late October |
| Avery Beach | Parking Lot Expansion | Fall 2026 |
| Allensville Road | Isolated Asphalt Repairs | Fall 2026 |
| Helen Street | Isolated Asphalt Repairs | Fall 2026 |
| Manominee Street | Isolated Asphalt Repairs | Fall 2026 |
Updated: June 26, 2026
District of Muskoka Road Construction and Closures
Updated: June 24, 2026
Learn more and stay updated by visiting District of Muskoka Road Construction and Closures.
Report a concern
To inquire or report a concern, please fill out the questions or concerns form or call 705-789-1751, option 5.