(Huntsville, ON) Sidewalk repair work on Main St. in downtown Huntsville, will be completed on May 16, 2024. This repair work was required as a result of deficiencies from the Diggin’ Downtown construction project, which was under warranty.
The laneway between Wooden Penny and Algonquin Outfitters is closed today (May 15) and will reopen on May 16.
All downtown businesses are open. Pedestrians should use the signalled intersection at Main and Brunel for safe crossing.
For more information on the Downtown Sidewalk Repair project, please see the original News Notice.
-30-